Apartment Handover Checklist for New Builds (Free Template)

Recording a finding with severity and photos during an inspection in Inspect it
Share

This apartment handover checklist is for the inspection on the day a new or refurbished apartment changes hands. It works from either side of the table: the buyer checking what they are getting, or the developer checking what they are about to hand over.

Allow 60 to 90 minutes for a two-bedroom apartment. Inspect in daylight, with the power and water on. Bring a phone charger to test sockets, a small spirit level, a torch and a roll of low-tack tape to mark defects. Every fail becomes a line on the snag list, with a photo.

Print this checklist

How to run the handover inspection

  • Work clockwise in every room, floor to ceiling, then fittings.
  • Operate everything. Every window, door, tap, switch and appliance.
  • Record location precisely. Room, wall, height. “Scratch on door” helps nobody.

The apartment handover checklist

1. Documents, meters and keys

CheckPassFailNotes
Keys, fobs and remotes counted and tested☐☐
Electricity, water, gas and heating meter readings recorded with photos☐☐
Appliance manuals and warranties handed over☐☐
Certificates provided: electrical, gas, ventilation commissioning as applicable☐☐
As-built plans and finishes schedule received☐☐
Emergency shut-off locations shown: water, gas, electricity☐☐

2. Entrance and hallway

CheckPassFailNotes
Entrance door closes, latches and locks smoothly☐☐
Door seals and threshold complete☐☐
Intercom and doorbell work☐☐
Smoke detector fitted and tested☐☐
Fuse board labelled, all circuits identified☐☐
Flooring level, no lifting or gaps at thresholds☐☐

3. Walls, ceilings and floors (every room)

CheckPassFailNotes
Paint even, no runs, patches or roller marks☐☐
No cracks at corners, ceiling junctions or around openings☐☐
Walls flat: check with light along the surface☐☐
Skirting fixed, mitres tight, sealed at top☐☐
Floor finish undamaged, no hollow sound, no squeaks☐☐
Expansion gaps covered☐☐

4. Windows and balcony doors

CheckPassFailNotes
Each one opens, closes, tilts and locks☐☐
Glass unscratched, no condensation between panes☐☐
Seals continuous, no daylight visible when closed☐☐
Sills fixed and sealed☐☐
Trickle vents open and close☐☐
Restrictors fitted where required☐☐

5. Internal doors

CheckPassFailNotes
Doors hang square, even gaps, no rubbing☐☐
Latch engages without pushing☐☐
Handles and locks secure☐☐
Door stops fitted☐☐
No damage to faces or edges☐☐

6. Kitchen

CheckPassFailNotes
Cabinets level, doors and drawers aligned and soft-close working☐☐
Worktop joints tight, no chips, sealed at wall☐☐
Sink sealed, no leaks under it after running water for two minutes☐☐
Hot water reaches the tap☐☐
Hob, oven, extractor, fridge, dishwasher all power on and run☐☐
Sockets above worktop all live☐☐
Splashback complete and sealed☐☐

7. Bathrooms

CheckPassFailNotes
Tiles uncracked, joints even, no hollow tiles☐☐
Silicone complete at bath, shower, basin and floor junctions☐☐
Shower floor drains fully, no ponding☐☐
Toilet fixed firm, flushes and refills, no leak at base☐☐
Taps and mixer operate, hot and cold correct way round☐☐
Extractor fan runs and pulls air☐☐
Towel radiator heats☐☐
Water pressure acceptable with two outlets open☐☐

8. Electrical, heating and ventilation

CheckPassFailNotes
Every socket live (test with charger)☐☐
Every switch operates the right light☐☐
Data and TV points present as specified☐☐
Radiators or underfloor heating warm in every zone☐☐
Thermostats respond☐☐
Ventilation unit running, filters fitted, air felt at each valve☐☐

9. Balcony, storage and parking

CheckPassFailNotes
Balcony floor drains away from the door☐☐
Balustrade firm, glass unchipped☐☐
External socket and light work☐☐
Storage unit accessible, dry and lockable☐☐
Parking space marked and matches the contract☐☐

Print this checklist

After the inspection

You will finish with a list. On a new apartment, 20 to 60 items is normal and most are cosmetic. What matters is what happens next: each item needs a clear description, a photo, a responsible trade and a date. Agree in writing which items must be fixed before you accept the keys and which can follow.

Logging a defect from an apartment handover checklist in Inspect it, with its room, description and photo.
Logging a handover defect in Inspect it with its room, description and photo.

Our guide to snagging and defect management explains how to run that list to zero. Developers handing over many units at once will find this apartment handover checklist in the Inspect it library, so each apartment gets the same inspection, each snag goes to the right trade, and the buyer receives a clear report. More on the software side in the building inspection software guide.

Frequently asked questions

What should I check at an apartment handover?

Documents, meter readings and keys, then every room: walls, ceilings, floors, windows, doors, kitchen fittings and appliances, bathrooms, electrics, heating and ventilation, and finally balcony, storage and parking.

How long does an apartment handover inspection take?

Allow 60 to 90 minutes for a two-bedroom apartment. Larger homes or ones with many fitted items take longer. Inspect in daylight with power and water connected.

How many defects are normal in a new apartment?

Between 20 and 60 items is common, most of them cosmetic, such as paint marks, sealant gaps and minor scratches. Functional and safety defects should be fixed before handover is accepted.

Written by of Inspect it.

See it on one of your own buildings

Run one real inspection with us and get the finished report before the call ends.

Book a free 15-minute demoSee the Inspect it app

Ready to make every inspection count?

Capture evidence on site, create professional reports with AI assistance and track every action to completion, all in one platform.

On this page